Our Projects
The ongoing project at Jatinga, Assam, is part of the Nrimbanglo-Jatinga-Harangajao National Highway section. It involves the construction of 250 rock piles, each 1200 mm in diameter, to provide a strong foundation in a challenging hilly terrain. The work is being carried out with a focus on quality, safety, and timely execution to support improved regional connectivity.
The ongoing “Cellesta” project at Laketown, Kolkata, involves the execution of 270 piles along with associated structural work. The scope also includes a test pile and load testing with materials to ensure structural integrity and performance. The project is being carried out with a focus on precision, safety, and quality to meet the demands of high-standard construction.
The completed L&T Mindtree project at Rajarhat, Kolkata, involved the execution of 277 piles of 1000 mm diameter and 59 piles of 750 mm diameter. The work was carried out with strict adherence to quality and safety standards, ensuring a strong and reliable foundation for the structure.
The completed project at Barcote, Rourkela, involved the launching of 135 girders weighing 165, 94, and 60 tonnes. The scope included complete girder locking, fixing, alignment, and shifting using cranes and specialized tools. The project was executed with precision and efficiency, ensuring structural stability and timely completion.
The Kolaghat Railway Bridge project, executed for GPT Infra Ltd, involves extensive piling works to support critical bridge infrastructure. The scope includes bored cast-in-situ piles of 1500 mm and 1200 mm diameter, constructed to depths of 45 meters and 35 meters, with permanent liners provided up to 15 meters to ensure stability and durability. The project is being carried out using three piling rigs, supported by a dedicated site team of 20 professionals and a workforce of over 70 skilled and unskilled labourers. Commencing on 20th August 2025, the project is progressing steadily and is scheduled for completion by 31st March 2026, with execution focused on safety, precision, and quality delivery.
The Kuakhia–Mangalpur Section (NH20) project, undertaken for Shivam Condev Pvt Ltd, involved precision girder launching works as part of the widening and strengthening of the highway corridor. The scope comprised the successful launching of 24 girders, each weighing 80 tonnes, executed with controlled alignment and strict safety measures. The project was completed using a compact yet efficient workforce, including a site team of 6 employees and 6 skilled labourers. Commencing on 8th December 2025, the works were executed smoothly and concluded on 26th December 2025, demonstrating effective planning, coordination, and timely delivery.